Ensuite Project Three

On this project the client requested a modern look that was easy to keep as this was would be used several times a day. To make this room fell a bit bigger we suggested removing the stud section that formed part of the shower enclosure. There was another obstacle in the design of the room, the slope of the stairs intruded into them room at floor level. To overcome this we recommended boxing out the real wall of the shower by a few inches.

Our engineers began by remove the existing suite, tiles and disposing of all of the rubbish. From here we formed the stud section from floor to ceiling and we then install the PVC ceiling panels. With the ease of maintenance in mind our fitters installed Multi Panels and a shower enclosure with a clean and clear coating. The clean and clear coating is available on many shower enclosure and helps to reduce lime scale build up on the glass. As we had install Multi panels on the walls we only installed tiles on the floor.

Once the floor had been complete the team complete the room by install the vanity unit, heated towel rail and toilet. For more information on the clean and clear system please contact us on 01472 500501